A 48 MW campus requiring full backbone delivery within a 22-week window.
Two mobilised crews, blown fibre backbone, 14,000 terminations, continuous QA.
Handed over three weeks early with zero certification failures.
VitCore delivers the connectivity, power and critical infrastructure behind high-performance environments across Europe.
Explore our capabilities -Every route we install is tested, documented and lit before handover. Light moves the moment we leave.
Power, cooling and data corridors engineered decades ahead of demand --- placed out of sight, built to be forgotten.
Every hall we deliver is five interdependent systems installed in sequence --- floor, security, cooling, connectivity and power. Step through the stack to see what VitCore installs, tests and hands over on each.
Redundant busway and ladder tray, fed A+B from two independent substations so no single failure can take a hall offline.
We install HV/LV distribution, transformers, switchgear, UPS and generator tie-ins, then commission the whole chain under load. Overhead busway lets operators add rack capacity without shutting a row down.
Redundant busway and ladder tray, fed A+B from two independent substations so no single failure can take a hall offline.
We install HV/LV distribution, transformers, switchgear, UPS and generator tie-ins, then commission the whole chain under load. Overhead busway lets operators add rack capacity without shutting a row down.










Numbers we can evidence --- capacity delivered, distance routed and people who show up on site.
Specialist crew
Engineers, project managers and site technicians recruited for mission-critical infrastructure.
Rapid mobilisation
Crews on site within 72 hours anywhere in our European footprint.
Distance routed
Fibre and power routes planned, permitted and delivered across the continent.
Specialist teams mobilised across European infrastructure projects with consistency, speed and control.
Amsterdam




Critical environments demand trained specialists who understand the standard, the environment and the responsibility attached to every connection.
A 48 MW campus requiring full backbone delivery within a 22-week window.
Two mobilised crews, blown fibre backbone, 14,000 terminations, continuous QA.
Handed over three weeks early with zero certification failures.
Live-environment expansion across four technical halls without downtime.
Phased night works, dressed containment routes, full as-built documentation.
Zero incidents across 11 months of live works.
LV distribution replacement supporting 120 MW of critical capacity.
Busway installation, terminations, integrated testing and commissioning.
Full capacity transferred with no interruption to client workloads.